I am putting in a parking area at my house. I plan on using limestone for the improved surface. I used our tractor with tiller to break up the black clay and I removed about 1' foot of soil. I plan on putting down a weed barrier then back fill. Is it better to back fill with sand and then limestone? Is there a better method all together? I am not doing concrete
Announcement
Collapse
No announcement yet.
Putting in a limestone pad for parking
Collapse
X
-
We’ve built hundreds of driveways and parking areas and M16’s right, remove 100% of the top soil, back fill with a good red clay and compaction is the key to a nice long lasting parking area or driveway. You don’t want a black clay base or it will be jacked pretty quick after it dries out a few times.
Personally I’d go with just about anything but limestone, it’s a mess from the day you spread it until the day you decide to remove it. I’m a fan of pea gravel myself but recycled asphalt is a great choice as well. Remember the word compaction LOL
Comment
-
Originally posted by Kong View PostWe’ve built hundreds of driveways and parking areas and M16’s right, remove 100% of the top soil, back fill with a good red clay and compaction is the key to a nice long lasting parking area or driveway. You don’t want a black clay base or it will be jacked pretty quick after it dries out a few times.
Personally I’d go with just about anything but limestone, it’s a mess from the day you spread it until the day you decide to remove it. I’m a fan of pea gravel myself but recycled asphalt is a great choice as well. Remember the word compaction LOL
Sent from my moto g stylus using Tapatalk
Comment
-
1. Weed barrier is a waste of money. I've yet to dig one up that wasn't mostly rotted away.
2. Remove 8" of topsoil and proof-roll to find any soft spots that need to be removed and replace.
3. I'd disagree with those saying replace black clay with red clay....clay in general prohibits water permeation, so when you get a rain the water will sit ON TOP of the clay which is where your new driveway material will be. Instead, place a nice 6" layer of select fill (mix of sand and clay). This will prevent much expansion and shrinkage associated with moisture content in clay only. It will also allow water to drain through it better than solid clay but will hold up better than sand only. Select fill is what is used when you build a parking lot or building pad on most any commercial application.
4. If you're going to use limestone, make sure it is super clean and has a low ratio of fines. Fines is what causes the surface mess others have mentioned. I'd put a 3" layer of 2" limestone, compacted, and a 3" layer of 3/4-1" limestone compacted. However, there are much better materials, such as recycled asphalt. It that scenario, I'd put a 4" layer of 2" limestone and a 2" layer of recycled asphalt.
Comment
-
I’m doing this at my house, but I’m only removing 6” of grass & black gumbo. I’m putting weed barrier down, but not for weeds. I’ll put about 4” of concrete washout on top of the cloth, then compact it. The cloth helps bind it all together. Then I’ll top dress it with 2-3” of washed limestone. We do this on construction entrances on my job sites, and it holds up really well, though we go thicker for heavy truck/equipment traffic.
Sent from my iPhone using Tapatalk
Comment
-
Originally posted by txheartshot View PostI’m doing this at my house, but I’m only removing 6” of grass & black gumbo. I’m putting weed barrier down, but not for weeds. I’ll put about 4” of concrete washout on top of the cloth, then compact it. The cloth helps bind it all together. Then I’ll top dress it with 2-3” of washed limestone. We do this on construction entrances on my job sites, and it holds up really well, though we go thicker for heavy truck/equipment traffic.
Sent from my iPhone using Tapatalk
*****EDIT****** Sorry, I'm an idiot and mistook you for the OP.Last edited by curtintex; 05-09-2021, 01:10 PM.
Comment
-
Originally posted by curtintex View Post1. Weed barrier is a waste of money. I've yet to dig one up that wasn't mostly rotted away.
2. Remove 8" of topsoil and proof-roll to find any soft spots that need to be removed and replace.
3. I'd disagree with those saying replace black clay with red clay....clay in general prohibits water permeation, so when you get a rain the water will sit ON TOP of the clay which is where your new driveway material will be. Instead, place a nice 6" layer of select fill (mix of sand and clay). This will prevent much expansion and shrinkage associated with moisture content in clay only. It will also allow water to drain through it better than solid clay but will hold up better than sand only. Select fill is what is used when you build a parking lot or building pad on most any commercial application.
4. If you're going to use limestone, make sure it is super clean and has a low ratio of fines. Fines is what causes the surface mess others have mentioned. I'd put a 3" layer of 2" limestone, compacted, and a 3" layer of 3/4-1" limestone compacted. However, there are much better materials, such as recycled asphalt. It that scenario, I'd put a 4" layer of 2" limestone and a 2" layer of recycled asphalt.
Comment
-
Y’all must not be in rock country ........ everything y’all are saying to use instead of limestone , is limestone. Are you calling some non spec base limestone ? If so, that makes sense.
Like Curt said , if a crusher is around get some select fill from them. It will be the stuff a lot of people use for house pads.