Got some more work done.


The solar panel wires are now ran inside the trailer. But before I ran them to where they need to go, I realized the rest of the wires had to be ran too. So I got the wires ran inside 3/4” PVC pipe for the fan, for the speakers, for the water pump, for the kitchen light as well as the ceiling lights.




Had to stop working as I could tell I was getting tired. My words kept getting mixed up in the video.



So next I’ll be working on securing the PVC pipes so they won’t move around at all, gotta rivet the sheet metal back in place, finish running the wires to their end destination, and then seal things up with expanding foam. After that I’ll need to clean up the expanding foam and probably start putting the battery together.