The existing structure was founded on steel h piles. They either sheared off at the mud line or were plucked out. The new structure will be founded on 48” dia drilled shafts that will extend 2’ above the mean water level. From there there will 36” dia columns that support the bents. It’s a 158 working day contract. Not sure of the start date.
Announcement
Collapse
No announcement yet.
Kingsland bound
Collapse
X
-
Originally posted by Fixedblade View PostThe existing structure was founded on steel h piles. They either sheared off at the mud line or were plucked out. The new structure will be founded on 48” dia drilled shafts that will extend 2’ above the mean water level. From there there will 36” dia columns that support the bents. It’s a 158 working day contract. Not sure of the start date.
This place is amazing sometimes......
Thank you to everyone involved.
Comment
-
I haven’t been there for a few weeks was sent to another job here in San Antonio headed back as soon get things done here hope end this weekLast edited by live2hunt65; 01-01-2019, 08:05 PM.
Comment
Comment