    So we decided to plug in a second unit on our rental property and I’ll post the process up here. I’m glad to have another construction project underway. I’ll sub the concrete work and drywall and build the rest myself mostly of weekends with my pops and my cousin, both of whom are pretty handy and like to build stuff. Last weekend we did the utility locates and the layout work. Form and fill went in today. I’m taking the day off from work work tomorrow to do the plumbing and electrical rough in. Pour scheduled for Monday and it’ll be time to go vertical!!

    #2

    Concrete sub banged out the form and fill in a day by hand.

    Comment


      #3
      You line it will dog food? What’s going on there?

      Comment


        #4
        I did the design. It's 20' x 24', two-story, which makes about 900 sf interior, a tad less deducting interior walls and cabinets, etc.
        Attached Files

        Comment


          #5
          Originally posted by mavrick View Post
          You line it will dog food? What’s going on there?
          Yeah we're dog people!
          When you use sand for fill the bags help it stand up and not fall off into the trenches.

          Comment


            #6
            Still playing with the exterior design.
            Lots of windows per the boss.
            Attached Files

            Comment


              #7
              Oh and the budget I built so far has it at about $45k in materials plus the sub work. We'll see where it ends up-- I'm tracking every expense and hour of work just cuz I'm like that, an engineer.
              In any case I like building value in central Austin for $50/ft

              Comment


                #8
                Just a question
                Are you a licensed plumber?


                Sent from my iPhone using Tapatalk Pro

                Comment


                  #9
                  Originally posted by meltingfeather View Post
                  Yeah we're dog people!
                  When you use sand for fill the bags help it stand up and not fall off into the trenches.
                  Interesting, only time I’ve seen that is when beams are 69-70” deep.

                  Comment


                    #10
                    Took the day “off” to bang out the plumbing & electrical rough ins. Steel and plastic tomorrow. Pour Monday.

                    Comment


                      #11
                      You ain’t wasting no time

                      Comment


                        #12
                        Always admired people who can just build something with their own two hands,good luck.

                        Comment


                          #13
                          Coming along quickly and nicely.

                          Following along.

                          Rwc

                          Comment


                            #14
                            Following


                            Sent from my iPhone using Tapatalk

                            Comment


                              #15
                              Mini Barndo build

                              Oops

                              Comment