Ok, we’re pretty much finished with the interior renovation phase! It’s long overdue, but they did a good job and we’re pleased with the way it turned out.
You’ve probably noticed the glaring omission...
Probably the one thing I’ve been most excited about is having a big, 36” gas range to cook on. We converted from electric to propane. The tank is one of the first things I had set and I ordered the range around the same time in early January. It arrived 1/22, but they weren’t ready to install it so it remained in the box in the shop for over a month. A couple of weeks ago we moved it to the center of the LR and unboxed it, giving it a quick inspection. When it came time to install it last Friday, i couldn’t open the drawer and after closer inspection found a dent that has it in a bind.
I called Wayfair and they promptly agreed to send another and pick up the damaged unit. It shipped today...to arrive “after March 16...”
We also installed a farm sink and a new professional faucet that required modification of the existing cabinet. We’re still waiting on the cabinet doors to be installed.
My son-in-law had a friend build us a custom table for the “dining room.”
We’re still currently using our OLD chairs we had for our previous dining room.
I can’t remember if I posted pics of our new master shower/tub, so here it is. We will put up a glass door at some point.
Still a lot to do in terms of cleaning up, changing bulbs and decorating, but we’re finally finished with the contractor and crew!
I’m still in the market for a tractor to maintain the 26 acres, and I’ll continue to post updates.
Sent from my iPhone using Tapatalk
You’ve probably noticed the glaring omission...
Probably the one thing I’ve been most excited about is having a big, 36” gas range to cook on. We converted from electric to propane. The tank is one of the first things I had set and I ordered the range around the same time in early January. It arrived 1/22, but they weren’t ready to install it so it remained in the box in the shop for over a month. A couple of weeks ago we moved it to the center of the LR and unboxed it, giving it a quick inspection. When it came time to install it last Friday, i couldn’t open the drawer and after closer inspection found a dent that has it in a bind.
I called Wayfair and they promptly agreed to send another and pick up the damaged unit. It shipped today...to arrive “after March 16...”
We also installed a farm sink and a new professional faucet that required modification of the existing cabinet. We’re still waiting on the cabinet doors to be installed.
My son-in-law had a friend build us a custom table for the “dining room.”
We’re still currently using our OLD chairs we had for our previous dining room.
I can’t remember if I posted pics of our new master shower/tub, so here it is. We will put up a glass door at some point.
Still a lot to do in terms of cleaning up, changing bulbs and decorating, but we’re finally finished with the contractor and crew!
I’m still in the market for a tractor to maintain the 26 acres, and I’ll continue to post updates.
Sent from my iPhone using Tapatalk
Comment