Announcement

Collapse
No announcement yet.

Deer camp bathroom build

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

    #16
    Got a coat of paint on the outside today. Taking it to the lease Friday ready or not

    Comment


      #17



      Sent from my iPhone using Tapatalk

      Comment


        #18
        Can you fit your griddle in there ?

        Comment


          #19
          Looking good!

          Comment


            #20
            Looks great, I don't know how yalls camp is set up but if this outhouse is going to be anywhere near were you clean deer and sink with hot/cold water outside would be real nice come those 30 degree nights after cleaning deer.

            Comment


              #21
              Looks good.

              Comment


                #22
                That looks awesome!

                Comment


                  #23
                  [emoji1303][emoji1303]


                  Sent from my iPhone using Tapatalk

                  Comment


                    #24
                    Loaded down and headed west!




                    Sent from my iPhone using Tapatalk

                    Comment


                      #25
                      Travelling without it being strapped to the trailer!!!!!wow ,hope it makes it.

                      Comment


                        #26
                        Originally posted by Winman View Post
                        Travelling without it being strapped to the trailer!!!!!wow ,hope it makes it.
                        I think I see chains running through the skid timbers and pull pipe?

                        Great build and good luck on the delivery.

                        Rwc

                        Comment


                          #27
                          Originally posted by Winman View Post
                          Travelling without it being strapped to the trailer!!!!!wow ,hope it makes it.


                          LMAO. It's chained to the trailer. No worries.


                          Sent from my iPhone using Tapatalk

                          Comment


                            #28
                            We got the septic dug and field line installed. Ran it out about 80'. Unloaded the bathroom and did the plumbing. I installed lights, ac unit, and ceiling fan. Will get it all finished next time. Probably will be bow season before I go back. I will be working on it some between hunts. Not a bad outhouse IMO


                            Sent from my iPhone using Tapatalk

                            Comment


                              #29




                              Sent from my iPhone using Tapatalk

                              Comment


                                #30
                                Dang Jeff!! I didn't realize you were building that thing as first class as it is? That's gonna be nice. Could have used my septic dug out a little deeper with that bobcat btw.

                                Comment

                                Working...
                                X