    All,

    Building a Barndo on a 45 acre lake in South Mississippi. This thread will show progress as it happens.


    Dirt pad construction is the first step.

    #2
    Dirt Work

    First step was remove about 15 pine trees and make room for the house. Basic footprint is 35'x35' square with a 9'x12' master bath added off the back.
    Attached Files

    Comment


      #3
      Plans

      Here is the plan, I drew them myself and I am not an architect.
      Attached Files
      Last edited by Thainixs; 07-17-2018, 10:04 AM.

      Comment


        #4
        Cool! Will watch your progress.

        Comment


          #5
          Post and forming going in

          Traditional pole barn type construction.
          Attached Files

          Comment


            #6
            Slab is done

            Concrete slab is complete with poles set and plumbing rough-in in place.
            Attached Files

            Comment


              #7
              Nice looking piece of land. Congrats...IN for progress.

              Comment


                #8
                Start of framing

                Normal A frame type building, the carport will be another A frame that turns 90 degrees.
                Attached Files

                Comment


                  #9
                  Framing Complete

                  Framing is 95% complete and the windows are starting to go in on this pic.
                  Attached Files

                  Comment


                    #10
                    Keep the pictures coming from back in my home state

                    Comment


                      #11
                      Dried In!

                      Here of some pics of the day achieved "dried in". I used charcoal gray for my main walls, light gray on the trim pieces. Under my porches and carport is galvanized. Roof is galvanized.
                      Attached Files

                      Comment


                        #12
                        Radiant Barrier

                        Forgot to mention a R4 Radiant barrier was added before the sheet metal and roofing went on. Here you can see the underside of the radiant barrier in this pic.
                        Attached Files

                        Comment


                          #13
                          Concrete cleaning and staining

                          Pressure Washing the concrete then applying concrete stain. Three colors Walnut, Black, and Lawn Green. The green may be a little loud, so we may tone this down by ragging some of the walnut over the green on a room by room basis.
                          Attached Files

                          Comment


                            #14
                            Looking good .......

                            Comment


                              #15
                              Sleeping Loft

                              Flooring my daughters sleeping loft. It ended up 12'x14', so that's a nice size bedroom. So we now have two lofts one on the front 8'x12' (reading nook and extra sleeping on a pullout couch) and my daughters bedroom on the back.
                              Attached Files