Looking at spending $6K-$7K. (Keeping existing duct work, etc.)
House is 2200sq ft. Currently have a 4 ton 10 seer system that is 20 years old and beginning to fail.
Was quoted $6K installed for a Trane 4 ton 14 seer and $7K for the 16 seer. (I'm assuming these are basic/base models.)
I'm considering looking at a Goodman 2 stage system, but hear mixed reviews about 2 stage or variable speed systems here in Texas.
Sent from my SM-G981U using Tapatalk
House is 2200sq ft. Currently have a 4 ton 10 seer system that is 20 years old and beginning to fail.
Was quoted $6K installed for a Trane 4 ton 14 seer and $7K for the 16 seer. (I'm assuming these are basic/base models.)
I'm considering looking at a Goodman 2 stage system, but hear mixed reviews about 2 stage or variable speed systems here in Texas.
Sent from my SM-G981U using Tapatalk
Comment