Materials so far. The goal for foundation up to the point of Sub floor is 10% of full build cost. So far I'm sitting pretty good.
(43) 4x6x10 Treated for Post and Beams $990.72
(42) Sacks of 80# Conc Mix $200.79
(64) 2x8x12 Pine for Floor Joist $540.67
(4) 2x8x20 Pine for Outside Floor Joist $64.77
(30) 4x8 Tongue and Groove Sub Floor $779.18
Foundation Total $2576.13
Comment
-
Originally posted by Antlers86 View PostMaterials so far. The goal for foundation up to the point of Sub floor is 10% of full build cost. So far I'm sitting pretty good.
(43) 4x6x10 Treated for Post and Beams $990.72
(42) Sacks of 80# Conc Mix $200.79
(64) 2x8x12 Pine for Floor Joist $540.67
(4) 2x8x20 Pine for Outside Floor Joist $64.77
(30) 4x8 Tongue and Groove Sub Floor $779.18
Foundation Total $2576.13
Comment
-
Originally posted by Antlers86 View PostMaterials so far. The goal for foundation up to the point of Sub floor is 10% of full build cost. So far I'm sitting pretty good.
(43) 4x6x10 Treated for Post and Beams $990.72
(42) Sacks of 80# Conc Mix $200.79
(64) 2x8x12 Pine for Floor Joist $540.67
(4) 2x8x20 Pine for Outside Floor Joist $64.77
(30) 4x8 Tongue and Groove Sub Floor $779.18
Foundation Total $2576.13
Comment
-
Originally posted by SwampRabbit View PostFastener costs? (Screws, nails, optional straps/hangers?) That is the one that always seems to get me... even on the smallest of projects where I don't sue straps/hangers.
Comment
-
At a stopping point for a week or so. Will cover with plastic tomorrow and start framing in a couple weeks. Hard part is complete!
Main thing to know here is stagger the tongue and groove sub floor. Other than that really nothing to it. I normally would use ring shanked nails with nailer but still didn't bring generator. Used 2.5" deck screws. Feels good to be elevated looking over the pond view!