I am installing a service for my barn. I have URD Syracuse that I'm using for the 100A service about 220' run or so.
That being said, I have the panel inside my barn and had planned on running up to the panel directly with the URD.
I'm reading that that's not the standard with URD cable, however some say it's a matter of interpretation.
Does anyone have specific experience with this? Is it okay to run the URD to feed a service located on the inside of a structure?
Thanks for the help.
That being said, I have the panel inside my barn and had planned on running up to the panel directly with the URD.
I'm reading that that's not the standard with URD cable, however some say it's a matter of interpretation.
Does anyone have specific experience with this? Is it okay to run the URD to feed a service located on the inside of a structure?
Thanks for the help.