A clean job site is a happy job site. The best way to keep a clean job site is to have a clean job site when a new trade shows up. Nobody wants to be the guy blamed for making a mess when it’s obvious they did it.
We’re just about wrapped up with framing. The structural engineer and the third party inspector are both scheduled for Monday. Just a little blocking left to do along with the upstairs attic decking. HVAC should get started next week. Plumbing in 7-10 days, electrical after that with low voltage being the last thing to take care of before we insulate.
Hoping to start building steam and try to get insulated and hopefully started on Sheetrock by the end of March.
We’re just about wrapped up with framing. The structural engineer and the third party inspector are both scheduled for Monday. Just a little blocking left to do along with the upstairs attic decking. HVAC should get started next week. Plumbing in 7-10 days, electrical after that with low voltage being the last thing to take care of before we insulate.
Hoping to start building steam and try to get insulated and hopefully started on Sheetrock by the end of March.
Comment