Budget Home Build!!!

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

    Originally posted by texansfan View Post
    Looking good.
    Can you keep a rolling itemized cost sheet for those of us interested in following in your footsteps?

    Thanks
    Sure can

    Comment


      I'm gonna tag along. Cool build!

      Comment


        Materials so far. The goal for foundation up to the point of Sub floor is 10% of full build cost. So far I'm sitting pretty good.

        (43) 4x6x10 Treated for Post and Beams $990.72
        (42) Sacks of 80# Conc Mix $200.79
        (64) 2x8x12 Pine for Floor Joist $540.67
        (4) 2x8x20 Pine for Outside Floor Joist $64.77
        (30) 4x8 Tongue and Groove Sub Floor $779.18

        Foundation Total $2576.13

        Comment


          Originally posted by Antlers86 View Post
          Materials so far. The goal for foundation up to the point of Sub floor is 10% of full build cost. So far I'm sitting pretty good.

          (43) 4x6x10 Treated for Post and Beams $990.72
          (42) Sacks of 80# Conc Mix $200.79
          (64) 2x8x12 Pine for Floor Joist $540.67
          (4) 2x8x20 Pine for Outside Floor Joist $64.77
          (30) 4x8 Tongue and Groove Sub Floor $779.18

          Foundation Total $2576.13
          This is better than HGTV!

          Comment


            Originally posted by Antlers86 View Post
            Materials so far. The goal for foundation up to the point of Sub floor is 10% of full build cost. So far I'm sitting pretty good.

            (43) 4x6x10 Treated for Post and Beams $990.72
            (42) Sacks of 80# Conc Mix $200.79
            (64) 2x8x12 Pine for Floor Joist $540.67
            (4) 2x8x20 Pine for Outside Floor Joist $64.77
            (30) 4x8 Tongue and Groove Sub Floor $779.18

            Foundation Total $2576.13
            Fastener costs? (Screws, nails, optional straps/hangers?) That is the one that always seems to get me... even on the smallest of projects where I don't sue straps/hangers.

            Comment


              Originally posted by SwampRabbit View Post
              Fastener costs? (Screws, nails, optional straps/hangers?) That is the one that always seems to get me... even on the smallest of projects where I don't sue straps/hangers.
              True! I still have 2 boxes of 3" screws and framing nails leftover from past jobs. Guess that would need to be thrown in. Lol

              Comment


                Great job - I am enjoying the build.

                Comment


                  You plan on doing flat(ish) roof or some type of gable/pitch roof?
                  How high will the ceiling/walls be?

                  Comment


                    Originally posted by texansfan View Post
                    You plan on doing flat(ish) roof or some type of gable/pitch roof?
                    How high will the ceiling/walls be?
                    Gable roof. Somewhere between 8/12-12/12 pitch.

                    Just unloaded sub floor. Already sweating my tail off!
                    Attached Files

                    Comment


                      Originally posted by texansfan View Post
                      You plan on doing flat(ish) roof or some type of gable/pitch roof?
                      How high will the ceiling/walls be?
                      Something like this. Just imagine no chimney or dormers.
                      Attached Files

                      Comment


                        Following along. Awesome job so far Jason! Looking great!

                        Comment


                          And here I was griping about putting a new roof of my shed a couple of weekends ago lol. Lookin good bud!

                          Comment


                            Originally posted by Sleepy View Post
                            And here I was griping about putting a new roof of my shed a couple of weekends ago lol. Lookin good bud!
                            Thanks Logan!

                            Comment


                              At a stopping point for a week or so. Will cover with plastic tomorrow and start framing in a couple weeks. Hard part is complete!

                              Main thing to know here is stagger the tongue and groove sub floor. Other than that really nothing to it. I normally would use ring shanked nails with nailer but still didn't bring generator. Used 2.5" deck screws. Feels good to be elevated looking over the pond view!
                              Attached Files

                              Comment


                                Looks great.....

                                Comment

                                Working...