Electrician is finished. If I can get the water company to bore under the road and set my meter, then I’ll be able to finally pressure test all the plumbing. Water is my only hold up right now. Wrote them a check 115 days ago for water......
The water company finally set my meter yesterday morning so I cleared a path through the woods to run my water line yesterday evening. Trenched 300’ of 1.5” pipe and 185’ of 1” pipe. Then oncor showed up this morning to pull the line from the transformer to my shop.