Well the boss informed me that I'd be building our daughter a playhouse for Christmas. So off to work I go. Been working on it when I have time for the last couple of weeks. Just now getting around to posting some pics and will continue to update it as I come along. Wish me luck
First I leveled my foundation blocks with play sand and then started moving up from there making sure everything was level on the bottom. I used treated 6"x6" beams for my skids and treated 2"x6" for my cross supports. Left a 1' over hang on each side of the skids. Put some more floor supports in and topped it off with 3/4" treated plywood.
First I leveled my foundation blocks with play sand and then started moving up from there making sure everything was level on the bottom. I used treated 6"x6" beams for my skids and treated 2"x6" for my cross supports. Left a 1' over hang on each side of the skids. Put some more floor supports in and topped it off with 3/4" treated plywood.