This has been a two weekend build so far at my place in rocksprings. Was cut short the first weekend due to snow. Next on the list is plumbing the water lines and electrical. And then finish out the inside.
Thanks. Had my dads help but this was the first time either of us have built any kind of structure. A lot of trial and error. I think we're gonna bring in someone for electrical
That is the first flush system. Once it fills up with the dirty water off the roof a ball floats up an diverts the water to the tanks. Then when it stops raining it slowly drains out the bottom
Got some more done on the cabin bathroom. Finally have running water but no hot water yet. That's next time. Rocksprings is green thou. Had a little over 2 inches in the gauge
Comment