Announcement

Collapse
No announcement yet.

Budget Home Build!!!

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

    Originally posted by Antlers86 View Post
    Pics


    Is that the primary drain for a/c in the tub??


    Sent from my iPhone using Tapatalk

    Comment


      Great progress.


      Rwc

      Comment


        Originally posted by FLASH_OUTDOORS View Post
        Is that the primary drain for a/c in the tub??


        Sent from my iPhone using Tapatalk
        That's for the faucet to fill tub. I just haven't installed the head yet. I didn't have a threaded coupling to attach it so have it stubbed out long to cut and finish out this evening.

        Comment


          Originally posted by Antlers86 View Post
          That's for the faucet to fill tub. I just haven't installed the head yet. I didn't have a threaded coupling to attach it so have it stubbed out long to cut and finish out this evening.


          Lol I didn’t even think of that !!


          Sent from my iPhone using Tapatalk

          Comment


            great work, great thread. I love the updates!!

            Comment


              Where's the doggie door?

              Comment


                i just read all 13 pages plus the thief story. awesome job dude.

                Comment


                  man awesome build!

                  Comment


                    Awesome!

                    Comment


                      Originally posted by FLASH_OUTDOORS View Post
                      Lol I didn’t even think of that !!


                      Sent from my iPhone using Tapatalk
                      Attached Files

                      Comment


                        Assume you are using cpvc instead of copper pipes?

                        Comment


                          Originally posted by TeamAmerica View Post
                          Assume you are using cpvc instead of copper pipes?
                          Yes

                          Comment


                            Good stuff. Pretty cool to look back through the thread and see the progression. Thanks for sharing.

                            Comment


                              Did some plumbing this wknd and now have water to the house. Decided not to pressure it up this evening since freezing temps are tonight and wouldn't have enough time to cover line. Will test it tomorrow.

                              After plumbing is checked for no leaks I can finish sheetrock by Tuesday that was covering plumbing. Have Tape/Texture guys hired for Wednesday-Tuesday to get it done.

                              Septic tanks were uncovered today and we should be able to use existing. Big savings there. Having a company come out tomorrow to clean tanks and stub up line for me to tie into.

                              Black Friday was a success on flooring at $0.49/SQ/Ft on laminate panels. $545 total and just need to pick up some under padding. Once Tape/Texture is complete I will lay the flooring, base board/trim, cabinets, vanities and fixtures. Rockin and Rollin looking to be moving in 2nd week of December!
                              Attached Files

                              Comment


                                Awesome! Have followed since day #1 and am excited that you are so close.....well done sir.

                                Comment

                                Working...
                                X