    project mgt / contractors

    Good grief - I am finding out our place won't be near ready till December. Mostly because contractors can't get stuff done because they have too much to do. Drywall / float / tape / paint and that is just to get stuff kinda ready.

    Anyone else feel like their stuff is too slow?

    Is everyone having the same problem or is this just my dumb luck?

    Oi!

    #2
    Now contractor wants to charge close to 8k to paint the house. Good grief that seems high.

    Comment


      #3
      we had a contractor start the house 20 oct. we just got texture on the walls the week before thanksgiving. painting the ceilings was not in the original bid, and never discussed when we talked to him, even though we said we wanted to change wall colors. oh, and the ceiling paint wasnt going to be in all the rooms downstairs, meaning the tall arsed foyer ceiling that requires scaffolding to paint it, wasnt part of the ceiling paint bid. add'l $$ to paint that part. trim on our stairway wont match what will be installed on the floor even though it butts up against it. extra $$ that we didnt catch. EVERYTHING IS A CHANGE ORDER!

      Comment


        #4
        Originally posted by 4wheels View Post
        Now contractor wants to charge close to 8k to paint the house. Good grief that seems high.


        How many sq ft?
        A lot of siding, trim work?
        Is he painting staining cabinets too?
        Different color ceiling or rooms? Crown moulding?
        Builtins?

        I wish my paint bill was 8k. It's all relative.

        Comment


          #5
          Originally posted by cattlelackranch View Post
          How many sq ft?
          A lot of siding, trim work?
          Is he painting staining cabinets too?
          Different color ceiling or rooms? Crown moulding?
          Builtins?

          I wish my paint bill was 8k. It's all relative.
          Yes on Trim work.
          No staining cabinets
          No painting cabinets
          Supposed to be same color in every room. Objective is to get contractor out of house as soon as possible. Hoping limiting the scope of work does it

          Comment


            #6
            Originally posted by cattlelackranch View Post
            How many sq ft?
            A lot of siding, trim work?
            Is he painting staining cabinets too?
            Different color ceiling or rooms? Crown moulding?
            Builtins?

            I wish my paint bill was 8k. It's all relative.
            Yes on Trim work.
            No staining cabinets
            No painting cabinets
            Supposed to be same color in every room. Objective is to get contractor out of house as soon as possible. Hoping limiting the scope of work does it
            House size is about 2200 sq feet.

            Walls, trim, doors..

            Comment


              #7
              Thats about the quote we have for painting all rooms and ceilings downstairs

              Comment


                #8
                Know your contractor

                My guy has been great, said 9 months and has kept it under. Also built 4000 ft. Living and 5000 under roof for $365k!

                Comment


                  #9
                  Originally posted by 4wheels View Post
                  Yes on Trim work.

                  No staining cabinets

                  No painting cabinets

                  Supposed to be same color in every room. Objective is to get contractor out of house as soon as possible. Hoping limiting the scope of work does it

                  House size is about 2200 sq feet.



                  Walls, trim, doors..


                  Then that does seem a little high.