Originally posted by Kbeaz
View Post
The t-posts will be used in my main winter project, which will be erecting a 1500' run of fence to make my ranch fully enclosed. With these t-posts, and a deal lined up for the steel posts (every 5th post, with concrete footings), my BOM is now needing six rolls of barbed wire, two corner braces, and ~4 H-braces. Once deer season is over, I will knock it out! I estimate (and perhaps this post will be the source of much laughter later on) that with a few helpers, I should be able to finish the fence in about 3 weekends of work.
Comment