I just had a barn built on my property. I decided to build a pole barn based mostly on my budget and needs.
Now I’m considering putting down the concrete floor and am curious what you guys are seeing.
The barn is in Brazoria if that makes a difference. I had a pad built for it on select fill, but it will still need some dirt work done to level it and whatnot. I’m not sure if the concrete companies do that regularly or not.
The barn is 40x60 main area. 25’ porch on the 40’ side and I have a 15’ leanto the full 85’
What do y’all think I’m looking at price wise?
Also, any recommendations on the specifications of the slab?
If you know a good contractor, I’m all ears as well
Now I’m considering putting down the concrete floor and am curious what you guys are seeing.
The barn is in Brazoria if that makes a difference. I had a pad built for it on select fill, but it will still need some dirt work done to level it and whatnot. I’m not sure if the concrete companies do that regularly or not.
The barn is 40x60 main area. 25’ porch on the 40’ side and I have a 15’ leanto the full 85’
What do y’all think I’m looking at price wise?
Also, any recommendations on the specifications of the slab?
If you know a good contractor, I’m all ears as well