All the materials were delivered Thursday the builder will start on it Monday. It will be a 30x40x12 with two 10x10 roll up doors and one walk through door. Pretty excited been wanting a shop for years now.





Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-14-2018, 07:29 PM   #2
Ohio Darin
Eight Point
 
Ohio Darin's Avatar
 
Join Date: Feb 2009
Location: Cincinnati, Ohio
Hunt In: Ohio, Kentucky, Indiana
Default

Awesome. Keep us posted as it goes up....
Ohio Darin is online now   Reply With Quote Back To The Top
Old 04-14-2018, 08:48 PM   #3
Merc
Ten Point
 
Merc's Avatar
 
Join Date: May 2013
Location: Anchorage/POC
Hunt In: Vanderpool/Alaska...
Default

Can't wait to watch this one go up. Put my deposit down yesterday on a building.

Who'd you get the building from?

Sent from my SM-G930T using Tapatalk
Merc is offline   Reply With Quote Back To The Top
Old 04-14-2018, 09:33 PM   #4
phoneman
Ten Point
 
phoneman's Avatar
 
Join Date: Jan 2007
Location: weatherford,, Tx
Hunt In: Lipan, Tx
Default

Tuned In
phoneman is offline   Reply With Quote Back To The Top
Old 04-15-2018, 01:41 PM   #5
G5-Maniac
Eight Point
 
G5-Maniac's Avatar
 
Join Date: Oct 2010
Location: Dayton Tx
Default

Itís a company I found on Facebook East Texas Shop builders. They beat everyoneís price and their customer service is top notch. Really nice guys. Iíll post pics Monday when they start building it.


Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-16-2018, 11:36 AM   #6
G5-Maniac
Eight Point
 
G5-Maniac's Avatar
 
Join Date: Oct 2010
Location: Dayton Tx
Default

Poles going up




Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-16-2018, 02:04 PM   #7
LWC
Ten Point
 
Join Date: Oct 2010
Default

Is there going to be a slab? Or how does that work?
LWC is offline   Reply With Quote Back To The Top
Old 04-16-2018, 05:29 PM   #8
G5-Maniac
Eight Point
 
G5-Maniac's Avatar
 
Join Date: Oct 2010
Location: Dayton Tx
Default

The slab will be poured last.




Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-16-2018, 05:37 PM   #9
AgBass01
Pope & Young
 
AgBass01's Avatar
 
Join Date: Jul 2014
Location: Round Rock, TX
Hunt In: Cuero, Brownwood
Default

Holy cow, they did all that in 1 day?
AgBass01 is offline   Reply With Quote Back To The Top
Old 04-16-2018, 05:49 PM   #10
FLASH_OUTDOORS
Ten Point
 
FLASH_OUTDOORS's Avatar
 
Join Date: Aug 2012
Location: Tomball
Hunt In: Kennard
Default

In for how they did it in one day!


Sent from my iPhone using Tapatalk
FLASH_OUTDOORS is offline   Reply With Quote Back To The Top
Old 04-16-2018, 06:07 PM   #11
mmoses
Ten Point
 
mmoses's Avatar
 
Join Date: Aug 2012
Location: League City TX
Hunt In: Texas
Default

No way! One day?
mmoses is offline   Reply With Quote Back To The Top
Old 04-16-2018, 06:24 PM   #12
G5-Maniac
Eight Point
 
G5-Maniac's Avatar
 
Join Date: Oct 2010
Location: Dayton Tx
Default

Yes they built the whole thing in one day. Everything but concrete. Concrete will be poured in a couple days. They got here at 10:30 and just left.




Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-16-2018, 06:27 PM   #13
G5-Maniac
Eight Point
 
G5-Maniac's Avatar
 
Join Date: Oct 2010
Location: Dayton Tx
Default

The company is East Texas Shop builders llc they have a Facebook and a website. I highly recommend them. They do great work and have awesome customer service.


Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-16-2018, 06:32 PM   #14
savin yours
Pope & Young
 
savin yours's Avatar
 
Join Date: Feb 2007
Location: Texas
Hunt In: Lampasas
Default

Very nice!
savin yours is offline   Reply With Quote Back To The Top
Old 04-16-2018, 07:33 PM   #15
mmoses
Ten Point
 
mmoses's Avatar
 
Join Date: Aug 2012
Location: League City TX
Hunt In: Texas
Default

That is awesome. What is the price tag on that?
mmoses is offline   Reply With Quote Back To The Top
Old 04-16-2018, 07:40 PM   #16
jltkanderson
Spike
 
Join Date: Nov 2017
Default

WOW that looks great! cant believe you got it done so quick!!
jltkanderson is offline   Reply With Quote Back To The Top
Old 04-16-2018, 07:52 PM   #17
Mike D
Pope & Young
 
Mike D's Avatar
 
Join Date: Oct 2006
Location: North Texas
Hunt In: Haskell County, TX
Default New shop build.

Why do some builders do wood framing instead of steel?

Is there a significant cost savings?


Sent from my iPhone using Tapatalk Pro
Mike D is offline   Reply With Quote Back To The Top
Old 04-16-2018, 07:53 PM   #18
Kmiles84
Eight Point
 
Kmiles84's Avatar
 
Join Date: Oct 2014
Location: Conroe
Hunt In: Texas
Default

That’s nice, I was thinking of using Five Star in Montgomery for mine, may have to check these guys out price wise
Kmiles84 is offline   Reply With Quote Back To The Top
Old 04-16-2018, 08:18 PM   #19
G5-Maniac
Eight Point
 
G5-Maniac's Avatar
 
Join Date: Oct 2010
Location: Dayton Tx
Default

Big cost savings using wood over red iron. Im under 20k including the concrete. Only thing you have to do is your dirt work they donít do that.


Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-19-2018, 09:23 AM   #20
phibob808
Ten Point
 
phibob808's Avatar
 
Join Date: Apr 2008
Location: Brownsboro
Default

Thats awesome! Just sent them an e-mail for a quote.
phibob808 is offline   Reply With Quote Back To The Top
Old 04-20-2018, 07:40 AM   #21
glpoe1
Ten Point
 
glpoe1's Avatar
 
Join Date: Sep 2010
Location: Snyder, TX
Hunt In: Scurry Co.
Default

Wow, that is most impressive for a one day build. Enjoy your new shop.
glpoe1 is offline   Reply With Quote Back To The Top
Old 04-20-2018, 08:37 AM   #22
phibob808
Ten Point
 
phibob808's Avatar
 
Join Date: Apr 2008
Location: Brownsboro
Default

you got a heck of a deal. Contacted them about a 20X30 14' tall with a 15' overhang on the longer side. Roll up door on each end and one walk through door, and they priced me $19,000.
phibob808 is offline   Reply With Quote Back To The Top
Old 04-21-2018, 05:32 PM   #23
G5-Maniac
Eight Point
 
G5-Maniac's Avatar
 
Join Date: Oct 2010
Location: Dayton Tx
Default

Thanks for all the compliments guys. Iím getting concrete Tuesday Iíll post some more pics when itís finished. Next project is getting electricity to the shop and then wiring the inside.


Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-21-2018, 05:49 PM   #24
RascalArms
Pope & Young
 
RascalArms's Avatar
 
Join Date: Mar 2013
Location: Forney, TX
Hunt In: Schleicher County
Default

Quote:
Originally Posted by G5-Maniac View Post
Big cost savings using wood over red iron. Im under 20k including the concrete. Only thing you have to do is your dirt work they donít do that.


Sent from my iPhone using Tapatalk
Under $20K? Thatís amazing...and looks great.
RascalArms is offline   Reply With Quote Back To The Top
Old 04-21-2018, 06:04 PM   #25
MQ32Shooter
Pope & Young
 
MQ32Shooter's Avatar
 
Join Date: Oct 2006
Location: Garland, Texas
Hunt In: Cisco, Texas
Default

Amazing man. Congrats
MQ32Shooter is offline   Reply With Quote Back To The Top
Old 04-21-2018, 08:07 PM   #26
kmitchl
Ten Point
 
Join Date: Aug 2011
Location: Montgomery, TX
Hunt In: Edwards Co
Default

Quote:
Originally Posted by G5-Maniac View Post
Thanks for all the compliments guys. Iím getting concrete Tuesday Iíll post some more pics when itís finished. Next project is getting electricity to the shop and then wiring the inside.


Sent from my iPhone using Tapatalk
Might consider stubbing in some 2Ē pvc conduit for the electrical before the concrete pour. I try to avoid any conduits running up the outside of a building. The weed eater is tough on them.
kmitchl is online now   Reply With Quote Back To The Top
Old 04-21-2018, 08:13 PM   #27
TexasBear
Ten Point
 
TexasBear's Avatar
 
Join Date: May 2012
Location: Joshua
Hunt In: Colorado
Default

Did they pour the concrete yet?
TexasBear is offline   Reply With Quote Back To The Top
Old 04-21-2018, 08:27 PM   #28
G5-Maniac
Eight Point
 
G5-Maniac's Avatar
 
Join Date: Oct 2010
Location: Dayton Tx
Default

Quote:
Originally Posted by TexasBear View Post
Did they pour the concrete yet?


Tuesday.


Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-25-2018, 10:49 AM   #29
G5-Maniac
Eight Point
 
G5-Maniac's Avatar
 
Join Date: Oct 2010
Location: Dayton Tx
Default

Got my concrete poured and finished yesterday. Just waiting for electrical now which is a whole nother headache. How long do yíall suggest letting the concrete dry before doing anything? Figured tomorrow I could move my stuff back in. Heaviest thing I have is a zero turn




Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-25-2018, 12:11 PM   #30
savin yours
Pope & Young
 
savin yours's Avatar
 
Join Date: Feb 2007
Location: Texas
Hunt In: Lampasas
Default

Quote:
Originally Posted by G5-Maniac View Post
Got my concrete poured and finished yesterday. Just waiting for electrical now which is a whole nother headache. How long do yíall suggest letting the concrete dry before doing anything? Figured tomorrow I could move my stuff back in. Heaviest thing I have is a zero turn




Sent from my iPhone using Tapatalk


Oh yea, that should be fine. How thick?


Sent from my iPhone using Tapatalk
savin yours is offline   Reply With Quote Back To The Top
Old 04-25-2018, 02:54 PM   #31
JTCowpoke
Six Point
 
Join Date: Sep 2014
Location: Wichita Falls
Default

My concrete guy had me water my concrete several times a day for a few days to slow down the curing.
JTCowpoke is offline   Reply With Quote Back To The Top
Old 04-25-2018, 03:13 PM   #32
savin yours
Pope & Young
 
savin yours's Avatar
 
Join Date: Feb 2007
Location: Texas
Hunt In: Lampasas
Default

Quote:
Originally Posted by JTCowpoke View Post
My concrete guy had me water my concrete several times a day for a few days to slow down the curing.


I did too. But this one was poured in the spring with full shade, probly not needed. But I did add fiberglass to mine.


Sent from my iPhone using Tapatalk
savin yours is offline   Reply With Quote Back To The Top
Old 04-25-2018, 03:50 PM   #33
G5-Maniac
Eight Point
 
G5-Maniac's Avatar
 
Join Date: Oct 2010
Location: Dayton Tx
Default

Quote:
Originally Posted by savin yours View Post
Oh yea, that should be fine. How thick?


Sent from my iPhone using Tapatalk


Itís 4inches thick.


Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-25-2018, 06:17 PM   #34
coy-ote
Ten Point
 
Join Date: Feb 2009
Location: la vernia tx
Hunt In: Dimmit county
Default

Nice shop


Sent from my iPhone using Tapatalk
coy-ote is online now   Reply With Quote Back To The Top
Old 04-26-2018, 09:52 AM   #35
LuBowhunter
Pope & Young
 
LuBowhunter's Avatar
 
Join Date: Oct 2006
Location: Hamshire, Texas
Hunt In: Real County, Chambers County, Kansas, Wyoming, Montana, New Mexico, Nebraska
Default

Dang I wonder if they will come to my area!
LuBowhunter is online now   Reply With Quote Back To The Top
Old 04-26-2018, 12:29 PM   #36
G5-Maniac
Eight Point
 
G5-Maniac's Avatar
 
Join Date: Oct 2010
Location: Dayton Tx
Default

Quote:
Originally Posted by LuBowhunter View Post
Dang I wonder if they will come to my area!


They go all over. They are from Rusk and drove to me east of Houston. Wouldnít hurt to call and see.


Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-26-2018, 01:19 PM   #37
TeamAmerica
Ten Point
 
TeamAmerica's Avatar
 
Join Date: Oct 2016
Location: Dallas
Hunt In: Corsicana (Navarro County)
Default

Looks like a good company - did they pour the concrete or did you sub that out separately?
TeamAmerica is offline   Reply With Quote Back To The Top
Old 04-26-2018, 02:59 PM   #38
OldRiverRat
Ten Point
 
OldRiverRat's Avatar
 
Join Date: Mar 2009
Location: Deer Park, TX
Hunt In: Navarro County
Default

may also check these guys out

http://www.metalbuildingsandbarns.com/
Five Starr Metal Builders
Houston Division
19181 Highway 105 West
Montgomery, Texas 77356
8:00 AM – 5:00 PM Monday – Friday

Pricing Guide
Thank you for your interest in Five Starr Metal Builders. Here are some base prices for basic buildings that include the framing and sheeting, 4 inch rebar reinforced concrete slab, 1 – 10◊10 roll up door, 1 – 3068 entry door, and colored sheet metal. Prices vary by location so check out our service area and find the location closest to you.
We also offer extended roof lines, lean-to covers, variety of door sizes, insulation, and windows. Give us a call for pricing on a building to fit your needs.

Our base prices are:
24 x 30 x 10 = $11,300

30 x 30 x 10 = $13,500

30 x 40 x 10 = $16,400

30 x 50 x 10 = $20,100

40 x 60 x 10 = $29,900
OldRiverRat is offline   Reply With Quote Back To The Top
Old 04-27-2018, 10:45 AM   #39
G5-Maniac
Eight Point
 
G5-Maniac's Avatar
 
Join Date: Oct 2010
Location: Dayton Tx
Default

Quote:
Originally Posted by TeamAmerica View Post
Looks like a good company - did they pour the concrete or did you sub that out separately?


They did the concrete.


Sent from my iPhone using Tapatalk
G5-Maniac is offline   Reply With Quote Back To The Top
Old 04-27-2018, 11:06 AM   #40
KILLERMILLER
Eight Point
 
KILLERMILLER's Avatar
 
Join Date: Jun 2010
Location: Baytown, Tx
Hunt In: Gillespie County
Default

I had 5 Starr build mine and it looks like the exact same building... I bet someone quit from 5 Starr and started their own business. Looks good!!!

Last edited by KILLERMILLER; 04-27-2018 at 11:18 AM.
KILLERMILLER is offline   Reply With Quote Back To The Top
Old 04-28-2018, 08:26 PM   #41
ldoyle
Eight Point
 
ldoyle's Avatar
 
Join Date: Feb 2009
Location: Pflugerville , Texas
Hunt In: SW Colorado , Utopia Texas , Leaky Texas
Default

Quote:
Originally Posted by G5-Maniac View Post
The company is East Texas Shop builders llc they have a Facebook and a website. I highly recommend them. They do great work and have awesome customer service.


Sent from my iPhone using Tapatalk
And it appears they are very fast in putting one up !
ldoyle is offline   Reply With Quote Back To The Top
Old 04-29-2018, 08:31 PM   #42
OldRiverRat
Ten Point
 
OldRiverRat's Avatar
 
Join Date: Mar 2009
Location: Deer Park, TX
Hunt In: Navarro County
Default

Quote:
Originally Posted by G5-Maniac View Post
They did the concrete.


Sent from my iPhone using Tapatalk
Did they use rebar in the slab?
Iíve asked them for a quote for same size 30x40x12
OldRiverRat is offline   Reply With Quote Back To The Top
Old 04-30-2018, 01:36 PM   #43
equyst
Four Point
 
Join Date: Apr 2018
Default

very nice
equyst is offline   Reply With Quote Back To The Top
Old 04-30-2018, 01:39 PM   #44
txwhitetail
Pope & Young
 
txwhitetail's Avatar
 
Join Date: Apr 2014
Location: San Angelo
Hunt In: Irion Co
Default

Quote:
Originally Posted by Mike D View Post
Why do some builders do wood framing instead of steel?

Is there a significant cost savings?


Sent from my iPhone using Tapatalk Pro
Definitely somewhat cheaper (maybe not in the long run). Ceiling will be much lower on the same sidewall though.
txwhitetail is offline   Reply With Quote Back To The Top
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:51 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Copyright 1999-2012, TexasBowhunter.com