Announcement

Collapse
No announcement yet.

Barn Build

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

    #16
    Going smoothly. Slab and porch poured. Starting the flat work for drive, dog kennel, and wash area.
    Attached Files

    Comment


      #17
      [ATTACH]621705[/ATTACH]
      From the front looking at the porch. Hard to tell but it is 10 feet wide and runs the length of the building. There's a 12 x 10 door in the middle with windows on the left and a window and man door on the right.

      [ATTACH]621706[/ATTACH]
      From the back side. You can kind of see the doors. There are two 10 X 10 doors on the north side and then a 12 x 12 that lines up with the 12 x 10 on the other side in the center. Flat work in front of the doors with a trough for washing vehicles down. Then a 6 X 8 pad with trough for dog kennels and finally a man door on this side as well. Water and drains for inside and outside cleaning stations and then a bar on the far side.

      The two short sides have 14 X 14 doors oriented for the prevailing wind.

      Comment


        #18
        Looking good.

        Comment


          #19
          Gonna be nice !!!

          Comment


            #20
            First class!!

            Comment


              #21
              Keep the photos coming

              Comment


                #22
                Jealous

                Comment


                  #23
                  Wow. Awesome place.

                  Comment


                    #24
                    That is gonna be awesome when finished Sir!

                    Comment


                      #25
                      WoW that is really awesome...

                      Comment


                        #26
                        That is going to be nice!!!

                        Comment


                          #27
                          Greatness

                          Comment


                            #28
                            Appreciate everybody following along. Was out there yesterday and the slab looks good. They kept sprinklers on it for 2 days after the pour, but the wind blows like crazy up there and we got a few very small surface cracks. Not the concrete guys fault in my book.

                            Metal should get dropped next Tuesday and the erection crew starts on Tues aft or Wednesday.

                            Comment


                              #29
                              Lot of concrete

                              Comment


                                #30
                                Click image for larger version

Name:	20140604_134618.jpg
Views:	1
Size:	53.2 KB
ID:	24308940
                                Let the fun begin. Sparks fly tomorrow.

                                Comment

                                Working...
                                X