Going smoothly. Slab and porch poured. Starting the flat work for drive, dog kennel, and wash area.
Announcement
Collapse
No announcement yet.
Barn Build
Collapse
X
-
[ATTACH]621705[/ATTACH]
From the front looking at the porch. Hard to tell but it is 10 feet wide and runs the length of the building. There's a 12 x 10 door in the middle with windows on the left and a window and man door on the right.
[ATTACH]621706[/ATTACH]
From the back side. You can kind of see the doors. There are two 10 X 10 doors on the north side and then a 12 x 12 that lines up with the 12 x 10 on the other side in the center. Flat work in front of the doors with a trough for washing vehicles down. Then a 6 X 8 pad with trough for dog kennels and finally a man door on this side as well. Water and drains for inside and outside cleaning stations and then a bar on the far side.
The two short sides have 14 X 14 doors oriented for the prevailing wind.
Comment
-
Appreciate everybody following along. Was out there yesterday and the slab looks good. They kept sprinklers on it for 2 days after the pour, but the wind blows like crazy up there and we got a few very small surface cracks. Not the concrete guys fault in my book.
Metal should get dropped next Tuesday and the erection crew starts on Tues aft or Wednesday.