I priced this out with several contractors, and ultimately decided to sub it out myself (saved over $10k doing it this way). Still a work in progress, but getting closer to "done".
I put a demising wall splitting the space to 15'x25' and 35'x25'. The smaller portion is for storage and accessible from the main building that our business is in. The air compressor will also sit in the storage side to help keep the noise down in the shop. I have 125amps of 480V running to the building so I should be set for a while on power . Slab is 6" thick with a 12" perimeter. Metal building is 14 feet high in front and 16' high in the rear with 3" insulation and a 12' wide x 10' high roll up door.
Had an old Carrier 4 ton package unit that I set the other day (pulled it off a building we took down a few months back). Used the box blade to level the ground and set it on some spare cinder blocks. Waiting on the ductwork to come in now. Once I have air I will start moving everything over. Low voltage power should be finished Tuesday!
I put a demising wall splitting the space to 15'x25' and 35'x25'. The smaller portion is for storage and accessible from the main building that our business is in. The air compressor will also sit in the storage side to help keep the noise down in the shop. I have 125amps of 480V running to the building so I should be set for a while on power . Slab is 6" thick with a 12" perimeter. Metal building is 14 feet high in front and 16' high in the rear with 3" insulation and a 12' wide x 10' high roll up door.
Had an old Carrier 4 ton package unit that I set the other day (pulled it off a building we took down a few months back). Used the box blade to level the ground and set it on some spare cinder blocks. Waiting on the ductwork to come in now. Once I have air I will start moving everything over. Low voltage power should be finished Tuesday!