Default Drive way slope?

So we ran into some issues with our land and had to move our house over, now it is 6.5' out of level and we're having a pad built.. it's a lot cheaper to have the garage side on out left facing the neighbors but would prefer it to go on the right where there is no neighbors. The dirt work guy asked how far I want to go out from the garage so he can figure up the price. So how far out should I go? I don't want to be going into my garage at a 45 but I know there is gonna be some slope..
randal is offline   Reply With Quote Back To The Top
Old 05-19-2017, 02:24 PM   #2
mikemorvan
Pope & Young
 
mikemorvan's Avatar
 
Join Date: Oct 2009
Location: Haltom City
Hunt In: vetements noirs
Default

What do you mean by "6.5' out of level"? If the pad height is 6.5' higher than your "base" point, i'd stop right now and reevaluate. If you're build a driveway ramp from "0" to plus 6.5', your going to need about 40' of ramp, at a minimum. That'll be a bunch of fill that could subside, etc., etc.

Depending on your budget constraints, you might consider dropping the garage some. Think this through and weigh your options. Once it's done, you're saddled with it.
mikemorvan is offline   Reply With Quote Back To The Top
Old 05-19-2017, 02:25 PM   #3
Eagle19
Ten Point
 
Eagle19's Avatar
 
Join Date: Aug 2014
Location: College Station
Hunt In: Every where in Texas
Default

Have them drop the garage floor a few inches.
Eagle19 is online now   Reply With Quote Back To The Top
Old 05-19-2017, 03:06 PM   #4
BertramBass
Four Point
 
Join Date: Jan 2017
Hunt In: Coleman and Childress Counties
Default

Sometimes I have to drop my garages 2 boards at the plate and 1 at the bump but you will have more steps into the house. I typically do not "build" a pad, but instead scrape the organic, cut slightly on the high side, then back fill the low side of the slab after the forms are removed. Quite a bit of dirt is usually generated from the beams and septic. FYI I usually am not dealing with 6.5 foot, but the hand full of times I did, it was at the rear of the house where a pool was later installed. Driveway would have approximately a 20 foot relatively flat area and possibly a hammerhead, and then slope up or down depending on the road.
BertramBass is online now   Reply With Quote Back To The Top
Old 05-19-2017, 04:21 PM   #5
randal
Pope & Young
 
randal's Avatar
 
Join Date: Nov 2011
Location: Decatur
Hunt In: Crowell
Default

Quote:
Originally Posted by mikemorvan View Post
What do you mean by "6.5' out of level"? If the pad height is 6.5' higher than your "base" point, i'd stop right now and reevaluate. If you're build a driveway ramp from "0" to plus 6.5', your going to need about 40' of ramp, at a minimum. That'll be a bunch of fill that could subside, etc., etc.

Depending on your budget constraints, you might consider dropping the garage some. Think this through and weigh your options. Once it's done, you're saddled with it.
Yes we had to move the house, it's 90' long and if you start on the left at the ground you are 6 1/2' above the ground at the other end...
randal is offline   Reply With Quote Back To The Top
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 10:43 PM.


Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright 1999-2012, TexasBowhunter.com